Concrete floor installation in Tacoma WA - a dry floor ready for what goes on top
Got bare dirt, a broken old slab or a room you're finishing? We pour a new floor built to stay dry and take your flooring.
Book an estimate for your concrete floor
We look at the ground, the access and your flooring plans before writing anything down.
What goes into a new concrete floor in Tacoma?
Concrete floor installation in Tacoma means laying a new slab right on the ground over a membrane that holds back ground moisture. Your basement, shop or addition ends up with a flat, dry floor that's ready for whatever goes on top. The pour is the quick part. The drying afterward is what really sets your schedule.
Usually it's a basement with a dirt or broken floor, a shop or addition that needs a slab, or a room you're finishing and want to get right the first time. If it's the garage, our garage floor concrete page covers that work. The price moves with the floor's size, how easy it is to get concrete to it, how much base work the ground needs and whether you want it heated. The schedule turns less on the pour day than on the weather and the drying time before flooring can go down, and you'll get all of it in writing at the estimate.
How we handle concrete floor installation
First we talk about what's going on top of the floor, whether that's tile, wood, carpet, a coating or nothing at all, because that decides how we set the moisture barrier and where the joints go. Then we dig out and pack the subgrade, the soil the slab sits on, since a floor that settles takes your flooring down with it. The barrier goes down next. After the pour and the finish we cut control joints, shallow cuts that give the concrete a place to crack where we chose instead of across the middle of your room. Curing comes after that, the early wait while the concrete gains strength, and I'll be straight with you that the slab still needs drying time once it's cured before any flooring goes down. If the budget gets tight, I'd rather you save on the finish than on the base, because you can redo a finish later but you can't fix a base once there's a floor on it.
A new floor often changes the height at a doorway or back entry, so we can build concrete steps to meet it properly. If the project carries on outside to the pool, we pour concrete pool decks too, and we pay the same attention to the ground underneath.
Concrete floor installation in Tacoma, from permits to the ground underneath
Tacoma's starting point is that most construction needs a permit. The city's list of work that doesn't names driveways, sidewalks and tiling but doesn't mention concrete floors, so don't assume a new floor gets a pass. Before work starts we check which office covers your address and what it will want to see. When a permit is needed we handle the paperwork, or if it's one you have to get yourself, we tell you what to bring. We do the same check outside the city too, since we're based in Tacoma and work in the cities around it in Pierce County and south King County.
The ground counts as much as the paperwork. A Pierce County soils map says liquefaction, wet soil losing its strength when the ground shakes, typically happens in fill and in loose, sandy, water-soaked soil, the kind found in low spots near the shore, around lakes and along river valleys. On lots like that we dig in to see what's really under the floor before we settle on the base. If you want a heated floor, the state energy code requires insulation under the entire slab, so we plan for it before the base goes in. We look at ground and heating plans the same way on jobs in Fife and University Place.
Why call us for a concrete floor
I write your estimate myself
I come out, look at the space and write the estimate, and then I'm on site running the crew during the work. The person who heard your plans is the one making sure the floor matches them.
In business since 2017
I started this business in 2017 after learning the trade on job sites from people who'd been finishing concrete for years. Those years taught me to ask one more question at the estimate instead of guessing and finding out later.
Licensed in Washington, fully insured
We're fully licensed and insured, so the work at your house is covered. It's the first thing worth checking with anyone you hire, and the questions below show you how.
Tight spaces and awkward starts
We're best known for the awkward jobs, like a basement with poor access, a sloped lot or a floor someone else wasn't sure how to start. If yours is one of those, that's a normal call for us.
- Phone
- (253) 354-0081
- Hours
- Mon–Sun: 7 AM–10 PM
- Location
- Tacoma, WA 98402
Call (253) 354-0081 or send us the details with the floor's size, where it is in the house and whether you plan to heat it or put flooring over it.
Get a written estimate for your new concrete floor
We reply within one business day to set a time, and the estimate is free, done on site and comes with no obligation. I come out, look at the space and the ground, and give you the estimate in writing so you can take your time with it.
- Phone
- (253) 354-0081
- Location
- Tacoma, WA 98402
- Hours
- Mon–Sun: 7 AM–10 PM
- Credentials
- Fully licensed and insured.
Frequently asked questions
How much does a new concrete floor cost in Tacoma?
There's no set price for a concrete floor until we've seen the space, because size, access and what's under it move the number more than anything else. Digging out and packing a soft base, getting concrete into a basement or tight backyard and adding insulation for a heated floor all add to the job, while a simple open floor on firm ground keeps the cost down. I'll write your figure out at the estimate.
How long before I can put flooring on a new concrete slab?
Under normal conditions a new slab can take anywhere from six weeks to a year or longer to dry enough for flooring. That's why you should plan the next stage around the drying, not the pour date. We'll talk about that timing at the estimate so your flooring installer isn't booked too early.
Will my new concrete floor crack?
Some cracking is normal and nobody can stop it entirely, but well-planned joints decide where those cracks go and keep them small. Wire mesh won't prevent cracks either, though it tends to keep cracks and joints from opening up. Ask us at the estimate how we'd lay out the joints in your room.
What is the best way to keep moisture from coming up through a concrete floor?
According to the industry's concrete floor guide, a vapor barrier laid in direct contact with the slab gives your flooring and your room the most protection. The same guide says plain polyethylene sheeting falls short of the standard and shouldn't be relied on under a slab. Before the pour, ask any contractor where their barrier will sit.
Can a new concrete floor help keep radon out of my house?
Yes, it can help. A slab laid over a membrane that lets very little through, with its joints sealed, also acts as a barrier to radon where radon is a concern. If a radon test at your house has come back high, tell us at the estimate so we plan the membrane and joints with that in mind.
How do I check a concrete contractor in Washington?
Look them up with the state's contractor verification tool, which shows whether they're registered and hold a valid bond and insurance. Washington requires every construction contractor to register with the Department of Labor & Industries, and state law requires them to be bonded and insured. It takes a couple of minutes, so it's worth doing before you sign anything.
Other concrete work that goes with a new floor
Concrete pool decks
Pool decks take bare feet, splashing water and summer sun, so they need a sound base, drainage that runs away from the pool and a surface that isn't slick.
Concrete steps construction
Worn or crumbling steps are easy to trip on, and new poured steps give you even rises and a solid landing on a packed base that matches your new floor height.

